Location: Revesby, NSW/Stenmar workshop
Budget: approx: $120k
Scope: Overhaul and upgrade steel manufacturing machine
Services provided:
- Disassembly and assessment of components
- 2 x hydraulic pumps—overhauled
- 5 x hydraulic motors—supplied and installed
- 2 x hydraulic motors—overhauled and tested
- 3 x relief valves and manifolds—supplied and installed
- 4 x cylinders—overhauled and tested
- 5 x valves—repaired and tested
- New directional valve bank—supplied and installed
- All filtration replaced
- Hoses and tubework—supplied and installed
- Machining and fabrication—repairs to rollers, brackets, clamps, etc
- Upgrades to filtration, accumulators, cooling circuit
- Reservoir—emptied, cleaned, re-worked, re-sealed
- Re-paint
- Replace all drive belts
- Replace thermostat
- Rework heat exchanger
- AutoCAD circuit schematic
- Onsite re-commissioning.
Before
![Stenmar - Machine Overhaul 5 hydraulic valves before](https://stenmar.com.au/wp-content/uploads/2020/11/Stenmar-Machine-Overhaul-5.jpg)
After
![Stenmar - Machine Overhaul Valves 1 Press hydraulic power unit valve set_after](https://stenmar.com.au/wp-content/uploads/2021/02/Stenmar-Machine-Overhaul-Valves-1.jpg)
After
![Stenmar - Machine Overhaul 6 hydraulic valves_after](https://stenmar.com.au/wp-content/uploads/2020/11/Stenmar-Machine-Overhaul-6.jpg)
Before
![Stenmar - Machine Overhaul 4 Machine requiring overhaul](https://stenmar.com.au/wp-content/uploads/2020/11/Stenmar-Machine-Overhaul-4.jpg)
After
![Stenmar - Machine Overhaul 1 Machine overhaul after](https://stenmar.com.au/wp-content/uploads/2020/11/Stenmar-Machine-Overhaul-1.jpg)